OMRON Industrial Automation Malaysia Northern Region Penang Sole distributor - EMS-IWK
Home
 
 
IWK Environmental Monitoring System (SCADA)
Customer Name : IWK-Batu Ferringhi 
   
Objective
 
- To monitor all equipments / pump process, status / Failure
 
- Provide analysis report by trending and alarm report
 
   
Project Implemention
 

- 5 PLC model;CJ1M to connected to equipments with around 200 plus run/stop, trip, high-limit,   high temperature signals

 
- Alert user for equipment failure by alarm report 
 
- One PLC Link to 5 PLC with wireless Ethernet network
 
   
Benefit 
 
- To real time monitor current equipments status by PC on office
 
- Track back or analysis the failure of equipment by report
 
   
Conclusion
 
5 sets of PLC have been installed with the features of collecting run/stop, trip, high-limit, low-limit, high temperature signals and providing alarm when the equipment fail to function
 

iwk 1.jpg
    iwk 4.jpg
 
iwk 2.jpg
iwk 3.jpg
     
           
 

e-Newsletter




Our Partners
Advantech
omron.jpg
patlite.jpg
moxa.png

 

Statcounter :